Risk factors of conceiving a project to produce electrical energy

Abstract

Not available.

Dimensions

Altmetric

PlumX Metrics

Downloads

Download data is not yet available.
Published
2016-09-13
Info
Issue
Section
News Column (not peer reviewed)
Keywords:
Geothermal energy, Risk, Business plan
Statistics
  • Abstract views: 410

  • PDF: 224
How to Cite
Cultrera, M. (2016). Risk factors of conceiving a project to produce electrical energy. Acque Sotterranee - Italian Journal of Groundwater, 5(2). https://doi.org/10.7343/as-2016-225